Lantrak Electrical

St Joseph’s Church Collingwood

About The Project

Rebuild of St Joseph’s Church which burnt down almost a decade ago. The original brick walls were tied in with a space frame and roof structure. This in conjunction with an impressive lighting package, encapsulates the main worship space with a high level of architectural finishes throughout. Additional to these works is a mezzanine gallery that overlooks the worship space, as well as refurbishment of the parish centre next door including new kitchen, toilets and store.

Builder – CCB Envico

Project Duration – 12 Months

Project Value – 8 Mil