Lantrak Electrical

Recent Projects

Deakin University Sports Science Building

Construction of the new specialised indoor Exercise and Sports Science Building as Deakin University’s Burwood Campus is in a visually prominent location of the Campus and is the first building to greet visitors from the east entry at Burwood Highway. Accordingly, the building has been designed to provide a dynamic view on entering the campus with the large façade cantilevered entry point incorporating recessed extrusion lighting to highlight angles.
The fur level building provides state of the art sport science learning facilities for the student including a dedicated Clinical Learning Centre and consulting rooms; specialist facilities and equipment for Biomechanics, Motor Learning, and strength & conditioning; a climate chamber that can simulate extreme temperatures, humidity and altitude; cardio area and open group fitness area; indoor running lanes, and open plan workspaces for staff and research students.
The Sports and Science Building was constructed whist keeping the remaining campus operational.

Ardeer Sports Pavilion

Construction of a new soccer sports pavilion in Melbourne’s western suburbs. Melbcon and Lantrak Electrical Services commenced construction at Ardeer Reserve Sports Pavilion in March 2017. This project involved demolishing the existing club rooms and constructing a new sports pavilion and car park surrounded by landscaped areas. Works included reintegration of existing field sports lighting as well as all light, power, data and AV/PA works.

Padua

Content goes here

Endeavour Hills

Content goes here

Ryman Health

Content goes here

Wonthaggi Secondary College

Construction of a brand new College with two large buildings include a 2 level Learning Building with classrooms and learning spaces and Games Hall Building which provided fitness and connect to external sports courts and landscape areas. The three-court stadium for basketball, volleyball, badminton and other sports and cultural events is being constructed off McKenzie Street in the South of Wonthaggi. Working together closely with SJ Higgins, Wonthaggi Secondary College marks another large VSBA project completed with our knowhow.

McKinnon Secondary College

Demolition of exiting 2 existing school blocks and partial demolition of 2 others. The project consists of the construction of a new 3 level Senior School with a gross floor area of 3,400 m2. Internal areas include Science Rooms and Male & Female Change rooms on the ground, GPC’s, Offices and Amenities on the first floor and GPC’s, Open Learning, Student Welfare, Office and Amenities on the first floor. All open areas consisted of exposed precast panels, making the rough in tricky, but the end result quite impressive. This project was part of the VSBA’s school infrastructure boom in 2017.

Tee Tree Lodge Mornington Aged Care

Construction of a new 103 bed Tee Tree Lodge Aged care facility. Complete with Nurse Call system, Security system, AV package and Dry Fire detection system. The project was constructed in Mornington’s growing hub near Main Street and is the first of two stages servicing Melbourne’s aging population. Lantrak Electrical was able to deliver a complete turnkey solution to a project with tight time frames and the large amount of technical detail required for these type of projects.

Mill Park Leisure Centre

Mill Park

Content goes here

Carey Baptist Grammar School

Carey Baptist Grammar School is a leading Christian co-educational independent school, committed to student-centred learning and well-being. It is an open-entry school with a philosophy of education that is based around a broad and challenging curriculum. The redevelopment of Carey’s Middle School building is a critical component of the school’s strategic plan to accommodate strong growth in student numbers. In collaboration with Monaco Hickey, six interconnected learning precincts, each of which is a physical expression of the subject it hosts and the learning experiences and resources students and teachers can expect to find there. Each learning precinct is composed from a wide variety of purposeful learning settings and clearly articulated circulation paths. The Middle School scheme is premised on three key design elements: the formal determination of the building by its context; a fully developed education plan, and the creation of an architectural framework to support the education plan. Another education project Lantrak Electrical is proud to be a part of.

St Joseph’s Church Collingwood

Rebuild of St Joseph’s Church which burnt down almost a decade ago. The original brick walls were tied in with a space frame and roof structure. This in conjunction with an impressive lighting package, encapsulates the main worship space with a high level of architectural finishes throughout. Additional to these works is a mezzanine gallery that overlooks the worship space, as well as refurbishment of the parish centre next door including new kitchen, toilets and store

Emmy Monash Aged Care

Refurbishment of a 3 storey 115 bed nursing home in Caulfield North. Works included but not limited to a completed demolition of 3 levels internally, integration of lighting, power, certified data and communications, fire system, PA system and nurse call into the existing facility while still keeping key areas operational. With a tight program, limited access to site and shut downs around the Jewish holidays, the project took a lot of forward planning and key personnel to complete.

Nunawading Community Hub

Content goes here

Banksia Reserve Sporting Facility

The $4 million project is an amalgamation of the Beaumaris football, cricket and tennis club pavilions. This 2 level Pavilion was built complete with restaurant/bistro, Club rooms, meeting rooms and industrial grade kitchen facilities. The works included light, power, CAT 6 data communication system, security, AV/PA system and reintegration of sports field lighting and tennis courts ‘book a court’ system

Benetas Aged Care Heidelberg

Construction of a new 98 bed nursing home on Lower Plenty road in Heidelberg. The project of a 1 tier basement and 3 levels spaning across two properties completes with new substation and EMF shielding works. Facilities include resident bedrooms, café, hair dressers store, nurse stations and basement laundry and patient facilities. Works included but not limited to, certified fibre optic communication and data system, fire detection and Nurse Call System.

Beaumaris Secondary College

Construction of a new school opening its doors in 2018 to Year 7 students. 3 buildings with modern tech school and gymnasium and open plan class rooms. Complete with first-class sporting facilities built in partnership with the Melbourne Cricket Club (MCC). These are shared by the college, the club and the wider community. The project has revitalised a rundown site to create facilities and an outdoor environment that can be enjoyed by everyone for generations to come.

Elwood Secondary College

Construction of a new 2 storey school extension to the 3 story main building, including refurbishment works, an overhaul of site mains reticulation and an upgrade of the MSB infrastructure. Facilities include tech school lecture rooms for mechanical/wood work, home economics a café and a large open plan learning area with a modern art deco lighting design. This project was part of the VSBA’s school infrastructure boom in 2017.

Wesley College

Content goes here